DRAFTING OF THE TECHNICAL DRAWINGS FOR THE SEWERAGE AND PURIFICATION ADJUSTMENT OF THE MUNICIPALITY OF LAGO

BRIEF DESCRIPTION OF THE INTERVENTION:

The project aims to return a sufficiently adequate infrastructure to the community which ensures objectives of an environmental nature and which guarantees adequate hygienic-sanitary conditions to the local population.

• Construction from scratch of the activated sludge purification plant serving the town of Lago (CS) serving a population of 2000 AE.

• Construction of 3 new compact plants with adherent biomass technology and compact ones of  “biorulli” type (loc. Piscopie 100 AE; loc. Versaggi 200 AE; loc. Terrati 200 AE)

• Construction of new lifting stations (loc. Greci and loc. Manieri) of 400 AE each.

• Adjustment and strengthening of the Aria di Lupi – Greci – Versaggi – Manieri sewerage network